RSS   Newsletter   Contact   Advertise with us

McDermott and BHGE awarded contracts for Ichthys gas field development

Share on Twitter Share on LinkedIn
Christian Fernsby ▼ | July 31, 2019
McDermott International and Baker Hughes announced that the companies were awarded contracts to provide a joint URF and SPS solution for the INPEX-operated Ichthys Liquefied Natural Gas (LNG) field development, located off the northwest coast of Western Australia.
McDermott International and Baker Hughes
America   McDermott International and Baker Hughes
The award includes a joint URF and SPS EPCI solution, comprising a new subsea well gathering system (GS4), tied back to the existing central processing facility.

In addition to the GS4 scope, the award includes in-fill URF EPCI scope involving the development of new subsea wells tied-in to the existing gathering systems.

Water depths in the field range from 787 to 885 feet (240 to 270 meters).

McDermott and BHGE will lead the project from the joint Project Management and Engineering office in Perth, Australia.

Fabrication of the subsea URF equipment will be carried out at McDermott's fabrication facility in Batam, Indonesia.

Utilizing the Subsea Connect execution model, BHGE will deliver the SPS scope, including vertical christmas trees, associated production control systems, distribution equipment and topside controls as well as associated installation and commissioning support services.

This award follows an earlier award granted to BHGE in 1Q 2019, including four christmas trees and associated SPS equipment for in-fill development.

Offshore installation of the URF and SPS equipment will commence in 2020 and be completed in 2023.

The field development will be carried out using state-of-the-art assets, including McDermott's derrick lay vessel, DLV 2000.


 

MORE INSIDE POST